一、性能介绍Features

易具有很高的解析度、优异的附着力、抗蚀刻性能,且易于追查瑕疵部分。

High resolution, excellent adhesion, etching resistance, and easiness to track defective parts of product.

技术资讯Specification:

产品名称

Product name

项目Items         

HT-20 R102

颜色
 Color

变色
 Change color

粘度
 Viscosity

25℃,粘度计/Brookfield Viscometer DV2T

12±5dPa.s

开罐后使用期限
 Pot life after mixing

24小时(25℃以下暗处保存))

24hours (Store in dark place below 25℃)

保存期限
 Shelf life

制造后12个月
 12 months after production

热风循环烘烤条件
 Curing condition (Convention oven)

80-95-95-95-80℃    5-8min

附着力

Adhesion

100/100

铅笔硬度

Hardness

 

2H

解析度
 Resolution

S/L=2mil/2mil

包装
 Potting

5kg/桶,20kg/桶
 5kg/ pot ,20kg/ pot
 
 

 

操作程序Process recommendations:


产品名称

Product name
 
项目Items

HT-20 R102

注意事项

Notes

开油

Mixing

开盖后加入开油水手动搅拌3-5min,然后静置5-10min加入涂布机使用即可

After opening the cover, add the diluent and manually stir 3-5min,  and hold 5-10min,then add into the coating machine


前处理

Pre-treat

磨刷→除油→微蚀→酸洗→水洗→烘干

微蚀速率:40-60μin        Micro corrosion rate: 40-60 μin

酸洗H2SO4浓度:3%-5%   H2SO4concentration: 3%- 5%

Brushing→Remove oil→Micro etching →Acid washing→Rinsing→Drying

磨痕测试:12-18mm
 水破测试:≧30s

The grind mark test: 12 to 18 mm
 The water break test:
30 s

涂布

Coating

辊涂生产速度约2.5-5.0m/min

Roller coating production speed 2.5-5.0m/min

膜厚控制

Film thickness:10-12μm

预烤

Pre-baking

80-95-95-95-80

5-8min

预烤后静置15min以上再进行曝光,静置时间不可超过24hr.

Hold time 15min above, no more than 24hr after  prebaking

曝光

Exposure

50-120mj/ cm2,5-9级(Steps)

曝光后静置15min以上再进行显影,静置时间不可超过24hr.

Hold time 15min above,no more than 24hr after  exposure

显影

Developing

Na2CO3浓度:0.8-1.2%
 温度:28-32℃
 喷淋压力:1.2-1.8kg/cm2
 时间:40-60sec

Na2CO3 concentration: 0.8 -1.2%
 Temperature:28-32

 Spray pressure: 1.2-1.2 kg/cm2
 Time: 40 to 60 SEC

显影点控制:50-60%
 Developing point control: 50-60%

蚀刻

Etching

酸性

Acid

一般为酸性氯化铜溶液          General :Cucl2
 
温度:48-52℃                Temperature:48-52
 
喷淋压力:1.5-2.5kg/cm2           Spray pressure: 1.5-2.5 kg/cm2
 
时间40-50sec                 Time of 40-50 sec

A.蚀刻因子:>2
 B.蚀刻均匀性:COV≥85%

A. Etch factor: > 2
 B. Etching uniformity:
COV≥85%

碱性

alkali

一般为碱性氯化铜溶液          General :Cucl2

温度:48-52℃                Temperature:48-52
 
喷淋压力:1.5-2.5kg/cm2           Spray pressure: 1.5-2.5 kg/cm2
 
时间40-50sec                 Time of 40-50 sec

剥膜

Stripping

NaOH:5-8%                 NaOH: 5-8%
 
温度:50℃                    Temperature: 50
 
喷淋压力:1.5-2.5kg/cm2          Spray pressure: 1.5-2.5 kg/cm2
 
时间:50~80sec              Time: 50 ~ 80sec


注明:以上为建议参数,现场使用时请根据自身工艺设备的实际情况进行调整。

Note: the above is the recommended parameters, on-site use, according to the actual situation of their own equipment to adjust.



Copyright:Guangzhou Hongtai Electronic Technology Co., Ltd.    粤ICP备20055157号

 Fax:020-34986800 . Telephone: 020-34986880  . Mailbox:hongtaiym@126.com . Business Line: 13318791398